Aerial view of Maldives atoll

Our Projects

Real Projects. Measurable Outcomes.

Every project we undertake is grounded in scientific rigour and a genuine commitment to the Maldives' environmental future. Below is our current portfolio of active and completed work.

8Active projects
5EIAs completed
3Projects ongoing
15+Years of practice
EIA for Proposed development of a Snorkeling Attraction at B. Goidhoo
CompletedEIA
B. Goidhoo, Baa Atoll2025

EIA for Proposed development of a Snorkeling Attraction at B. Goidhoo

Environmental Impact Assessment for a proposed development of a snorkeling attraction at Goidhoo island in Baa Atoll. The assessment covered baseline environmental conditions, potential impacts on the surrounding reef and coastal habitats, and recommended mitigation measures to guide the development.

EIA report submitted and approved
  • Full baseline environmental survey completed
  • Reef and coastal habitat impact assessment
  • EIA report approved by EPA Maldives
EIA for Proposed Development of a Mosque at B. Kudarikilu
CompletedEIA
B. Kudarikilu, Baa Atoll2025

EIA for Proposed Development of a Mosque at B. Kudarikilu

Environmental Impact Assessment for a proposed development at Kudarikilu island in Baa Atoll. The study assessed terrestrial and marine environmental conditions, identified key environmental sensitivities, and produced a comprehensive Environmental Management Plan for the development phase.

EIA report submitted and approved
  • Terrestrial and marine baseline surveys
  • Environmental Management Plan developed
  • EIA report approved by EPA Maldives
EIA for Proposed Land Clearance at HA. Baarah
CompletedEIA
HA. Baarah, Haa Alif Atoll2026

EIA for Proposed Land Clearance at HA. Baarah

Environmental Impact Assessment for proposed land clearance activities at Baarah island in Haa Alif Atoll. The assessment evaluated the environmental implications of vegetation clearance and land preparation, with particular attention to soil stability, drainage, and adjacent coastal habitats.

EIA report submitted and approved
  • Vegetation and habitat baseline survey
  • Soil stability and drainage assessment
  • EIA report approved by EPA Maldives
EIA for Proposed Reclamation and Shore Protection at K. Maniyafushi Mariculture Facility
CompletedEIA
K. Maniyafushi, Kaafu Atoll2026

EIA for Proposed Reclamation and Shore Protection at K. Maniyafushi Mariculture Facility

Environmental Impact Assessment for a proposed development project at Maniyafushi island in Kaafu Atoll. The EIA covered marine and terrestrial baseline conditions, assessed potential impacts on the surrounding lagoon and reef system, and produced mitigation and monitoring recommendations.

EIA report submitted and approved
  • Marine and terrestrial baseline surveys
  • Lagoon and reef impact assessment
  • EIA report approved by EPA Maldives
EIA for Proposed Mariculture Development at Dh. Thinhura
OngoingEIA
Dh. Thinhura, Dhaalu Atoll2026

EIA for Proposed Mariculture Development at Dh. Thinhura

Environmental Impact Assessment for a proposed mariculture development at Thinhura island in Dhaalu Atoll. The study is assessing the potential environmental impacts of marine aquaculture operations on the surrounding reef, lagoon water quality, and local fisheries resources.

EIA study underway
  • Marine baseline surveys in progress
  • Water quality and fisheries impact assessment
  • Reef and lagoon sensitivity mapping
EIA for Proposed Parking Building at Hulhumalé Phase 2
CompletedEIA
Hulhumalé Phase 2, Kaafu Atoll2026

EIA for Proposed Parking Building at Hulhumalé Phase 2

Environmental Impact Assessment for a proposed multi-storey parking building at Hulhumalé Phase 2. The assessment is evaluating construction phase and operational impacts on the urban environment, including noise, dust, drainage, and waste management considerations.

EIA report submitted and approved
  • Urban environmental baseline assessment
  • Construction and operational impact evaluation
  • Drainage and waste management review
ESG Consultancy for the BCRSI Project — Ministry of Climate Change
OngoingESG & Sustainability
Republic of Maldives2026

ESG Consultancy for the BCRSI Project — Ministry of Climate Change

The Building Climate Resilient Safer Islands (BCRSI) project is funded by the Green Climate Fund and implemented by the Ministry of Climate Change, Environment and Energy (MCCEE). Component 2 delivers coastal conservation measures, beach nourishment, groins and related works to reduce climate and erosion risk for island communities.

ESG assessments and reporting in progress
  • ESG assessments and reporting
  • Sustainability reporting aligned with international standards
  • Monitoring the project's Environmental and Social Management Framework (ESMF), Stakeholder Engagement Plan (SEP) and Gender Action Plan (GAP)
EIA for Proposed Installation of a 20MW Powerplant in Hulhumalé Phase 3
OngoingEIA
Hulhumalé Phase 3, Kaafu Atoll2026

EIA for Proposed Installation of a 20MW Powerplant in Hulhumalé Phase 3

Environmental Impact Assessment for the proposed installation of 20MW of high-efficiency medium-speed diesel generation in Hulhumalé. The project involves the design and installation of a temporary powerplant facility at Hulhumalé Phase 3 to meet growing energy demand, with the EIA assessing air quality, noise, fuel storage risks, drainage, and impacts on the surrounding urban and coastal environment.

EIA study underway
  • Air quality and emissions impact assessment
  • Noise, fuel storage and drainage risk evaluation
  • Urban and coastal environment impact screening

Have a project in mind?

Whether you need an EIA, an ESG framework, or an environmental audit — our team brings the expertise and local knowledge your project demands.